Planned
2100 FREEWAY DR
WOODLAND, CA
2100 Freeway Dr is the Fairfield Inn & Suites Sacramento Airport Woodland, a 3-star Marriott-branded hotel with 70 guest rooms, outdoor pool, and 24-hour business center. The hospitality property operates continuous HVAC, lighting, and hot-water loads typical of a mid-scale airport hotel.
Projected savings.
Year 1
$64,900
Lifetime (~30 yr)
$4,838,000
By the numbers.
2.3
Years to payback
$11.5M
Total benefits (lifetime)
$6.6M
Property value gain
$348,976
Tax incentives
Levelized cost of energy
Like most WOODLAND businesses, the site was paying high Peak rates of roughly $1.17 per kilowatt-hour and large Demand charges — the kind of bill structure that punishes daytime energy use and penalises the very hours commercial properties consume the most power.
SolarPorts evaluated their power usage and proposed a right-sized 75.0 kW solar system for on-site generation delivered as a rooftop array on the building.
The system is designed to produce roughly 138,173 AC kWh of clean energy each year, an estimated $64,900 in year-one utility offsets, and around $4,838,000 in net lifetime savings — turning a recurring operating-cost into a long-term, predictable energy hedge.
System spec
System design
- Site
- 2100 FREEWAY DR
WOODLAND, CA 95776-9505 - APN
- 027851009000
- Utility
- PG&E
- Seismic rating
- 1.2
- Irradiance
- 1.709
- System size
- 75.0 kW DC
- Estimated production
- 138,173 AC kWh / year
- Year-1 utility offset
- $64,900
- Lifetime savings (~30 yr)
- $4,838,000
- Solar panels
- 120 × Q.TRON XL-G2.3/BFG
- Wire loss
- 2.0%
Quick request
Prefer email? We'll do the rest.
Fill in the basics and we'll reply within one business day with a model tailored to your site — production, ITC, MACRS, SGIP and demand-charge offset.
Or send us your details and we'll reach out.
A team member will respond within one business day. Your information is never sold.