Proposed EV charging site

St. Francis Shopping Center
1380 Calistoga Rd, Santa Rosa, CA

16 Tesla Level 3 fast chargers under SolarPorts solar canopies — financed, built and operated by SolarPorts, with rent paid to the property for every kWh delivered.

What the property earns.

Property investment

$0

Rent, year 1

$175,200

Rent per year (from year 13)

$525,600

Total rent (30 years)

$13.2M

SolarPorts pays for the chargers, the solar canopies, installation, electricity and maintenance, and pays the property $0.10 for every kWh drivers charge, fixed for 30 years. Shoppers get covered parking and fast charging while they shop.

Why this site.

22,500

Visitors per day

49

EV charging sessions per day

2,180

EVs registered in ZIP 95409

$54,100

Community income (ZIP 95409)

3,310 kW

Grid capacity available

0

Fast chargers on site today

The proposal.

16

Tesla Level 3 chargers, 150 kW each

1

Power cabinet

4

SolarPorts covering 64 stalls

300 kW

Solar, DC

System spec

System design

Site
St. Francis Shopping Center
1380 Calistoga Rd, Santa Rosa, CA 95409
System size
300.0 kW DC
EV charging
16 × 150 kW = 2,400 kW
Energy delivered to drivers, year 1
1,752,000 kWh
Solar panels
480 × Hanerson HN21RN-66HT 625 BiFacial
SolarPort structures
4 × SolarPort 120
Chargers
16 × Tesla Supercharger V4, 1 power cabinet
Wire loss
2.0%

How these figures are estimated

  • This is a proposal, not a built project. Figures are estimates for discussion and are refined with a site survey and the utility.
  • Visitors and charging sessions per day: SolarPorts site selection research.
  • Chargers: 16 Tesla posts (SolarPorts site selection), at most 16 per site.
  • Use: each charger delivers 150 kW for 2 hours a day in year 1, growing 10% a year up to 6 hours a day (year 13).
  • Rent: $0.10 per kWh delivered, fixed, for 30 years. Federal and state incentives and LCFS credits go to SolarPorts as the owner and are not counted here.
  • Solar: up to 4 SolarPorts 120 (120 panels, 16 stalls each); production = kW DC × site irradiance × bifacial gain × (1 − 2% wire loss).

Own or manage this property?

Fast EV charging and solar parking at no cost to the property, with rent paid for every kWh. Ask us for the full site study.

Quick request

Prefer email? We'll do the rest.

Fill in the basics and we'll reply within one business day with a model tailored to your site — production, ITC, MACRS and demand-charge offset.

Or send us your details and we'll reach out.

A team member will respond within one business day. Your information is never sold.