390 GATEWAY DR
HOLLISTER, CA
390 Gateway Dr, Hollister, CA is a Fairfield Inn & Suites by Marriott, a 76-room limited-service hotel operating 24/7. The property sits on ~1.5 acres and has typical hotel energy loads including HVAC, lighting, laundry, and common-area operations.
Projected savings.
Year 1
$147,600
Lifetime (~30 yr)
$11,005,000
By the numbers.
1.2
Years to payback
$26.1M
Total benefits (lifetime)
$15.1M
Property value gain
$497,692
Tax incentives captured
Levelized cost of electricity
Like most HOLLISTER businesses, the site was paying high Peak rates and large Demand charges — the kind of bill structure that punishes daytime energy use and penalizes the very hours commercial properties consume the most power. The result was a Levelized Cost Of Energy (LCOE) of $1.16/kWh from PG&E, reduced to $0.02/kWh from SolarPorts.
SolarPorts evaluated their interval power usage (every 15 minutes) and proposed a right-sized 150 kW solar system for on-site generation delivered as 4 SolarPort carport structures above the parking lot.
The system now produces roughly 316,932 AC kWh of clean energy each year, an estimated $147,600 in year-one utility offsets, and around $11,005,000 in net lifetime savings — turning a recurring operating-cost into a long-term, predictable energy hedge.
System spec
System design
- Site
- 390 GATEWAY DR
HOLLISTER, CA 95023-3069 - APN
- 0534100030
- Utility
- PG&E
- Seismic rating
- 1
- Irradiance
- 2
- System size
- 150.0 kW DC
- Estimated production
- 316,932 AC kWh / year
- Year-1 utility offset
- $147,600
- Lifetime savings (~30 yr)
- $11,005,000
- Solar panels
- 240 × Q.TRON XL-G2.3/BFG
- SolarPort structures
- 4
- Wire loss
- 2.0%
Quick request
Prefer email? We'll do the rest.
Fill in the basics and we'll reply within one business day with a model tailored to your site — production, ITC, MACRS, SGIP and demand-charge offset.
Or send us your details and we'll reach out.
A team member will respond within one business day. Your information is never sold.