Proposed EV charging site

Walgreens Plaza
3860 Decoto Rd, Fremont, CA

8 Tesla Level 3 fast chargers under SolarPorts solar canopies — financed, built and operated by SolarPorts, with rent paid to the property for every kWh delivered.

What the property earns.

Property investment

$0

Rent, year 1

$87,600

Rent per year (from year 13)

$262,800

Total rent (30 years)

$6.6M

SolarPorts pays for the chargers, the solar canopies, installation, electricity and maintenance, and pays the property $0.10 for every kWh drivers charge, fixed for 30 years. Shoppers get covered parking and fast charging while they shop.

Why this site.

6,100

Visitors per day

21

EV charging sessions per day

3,420

EVs registered in ZIP 94555

$68,900

Community income (ZIP 94555)

4,286 kW

Grid capacity available

0

Fast chargers on site today

The proposal.

8

Tesla Level 3 chargers, 150 kW each

1

Power cabinet

4

SolarPorts covering 64 stalls

300 kW

Solar, DC

System spec

System design

Site
Walgreens Plaza
3860 Decoto Rd, Fremont, CA 94555
System size
300.0 kW DC
EV charging
8 × 150 kW = 1,200 kW
Energy delivered to drivers, year 1
876,000 kWh
Solar panels
480 × Hanerson HN21RN-66HT 625 BiFacial
SolarPort structures
4 × SolarPort 120
Chargers
8 × Tesla Supercharger V4, 1 power cabinet
Wire loss
2.0%

How these figures are estimated

  • This is a proposal, not a built project. Figures are estimates for discussion and are refined with a site survey and the utility.
  • Visitors and charging sessions per day: SolarPorts site selection research.
  • Chargers: 8 Tesla posts (charging demand), at most 16 per site.
  • Use: each charger delivers 150 kW for 2 hours a day in year 1, growing 10% a year up to 6 hours a day (year 13).
  • Rent: $0.10 per kWh delivered, fixed, for 30 years. Federal and state incentives and LCFS credits go to SolarPorts as the owner and are not counted here.
  • Solar: up to 4 SolarPorts 120 (120 panels, 16 stalls each); production = kW DC × site irradiance × bifacial gain × (1 − 2% wire loss).

Own or manage this property?

Fast EV charging and solar parking at no cost to the property, with rent paid for every kWh. Ask us for the full site study.

Quick request

Prefer email? We'll do the rest.

Fill in the basics and we'll reply within one business day with a model tailored to your site — production, ITC, MACRS and demand-charge offset.

Or send us your details and we'll reach out.

A team member will respond within one business day. Your information is never sold.