15301 Wicks Blvd
San Leandro, CA
15301 Wicks Blvd, San Leandro, CA 94579 is the Marina Community Center, a municipally operated City of San Leandro recreation facility offering multi-room event and meeting rentals, fitness programs, and community services. The site sits on approximately 2.81 acres with operating hours Monday through Friday 11:30 AM to 7:00 PM and Saturday 10:00 AM to 2:00 PM, indicating moderate daytime and early-evening electricity demand. The property features ample surface parking, making it a strong candidate for solar carport installation that could offset HVAC and lighting loads while generating cove...
Projected savings.
Year 1
$60,615
SolarPorts designed, engineered and built a 75 kW small-commercial solar project built on SolarPort carport structures at 15301 Wicks Blvd in San Leandro, CA. The site now generates a substantial share of its own electricity on-site, cutting peak-rate exposure and locking in long-term energy costs.
The installed system includes 120 solar panels (Runergy 625 Bi-Facial) mounted on 2 SolarPort carport structures above the parking lot, paired with 2 CPS 36 inverters.
In numbers, the project delivers a 75.0 kW DC nameplate capacity, roughly 134,700 AC kWh of clean energy per year, and an estimated $60,615 in year-one utility-bill offsets.
System spec
What got built.
- Site
- 15301 Wicks Blvd
San Leandro, CA - APN
- 80G-1320-3-28
- Utility
- Pacific Gas & Electric
- Seismic rating
- 1.44
- Irradiance
- 1,796
- System size
- 75.0 kW DC
- Estimated production
- 134,700 AC kWh / year
- Year-1 utility offset
- $60,615
- Solar panels
- 120 × Runergy 625 Bi-Facial
- Inverters
- 2 × CPS 36
- SolarPort structures
- 2
- Wire loss
- 2.0%
Quick request
Prefer email? We'll do the rest.
Fill in the basics and we'll reply within one business day with a model tailored to your site — production, ITC, MACRS, SGIP and demand-charge offset.
Or send us your details and we'll reach out.
A team member will respond within one business day. Your information is never sold.