1241 Manor Blvd
San Leandro, CA
1241 Manor Blvd, San Leandro, CA 94579 is the Manor Branch of the San Leandro Public Library, a municipally owned government/public-use facility built in 1954 and approximately 7,862 sq ft. Operating under City of San Leandro ownership, the branch is open to the public Monday through Saturday with peak foot traffic during Tuesday–Thursday evening hours. As a climate-controlled public building with consistent weekday and evening operational loads, it presents a viable candidate for a solar carport installation to offset HVAC and lighting energy consumption on a government utility account.
Projected savings.
Year 1
$212,963
SolarPorts designed, engineered and built a large-scale 250 kW commercial solar project built on SolarPort carport structures at 1241 Manor Blvd in San Leandro, CA. The site now generates a substantial share of its own electricity on-site, cutting peak-rate exposure and locking in long-term energy costs.
The installed system includes 400 solar panels (Runergy 625 Bi-Facial) mounted on 7 SolarPort carport structures above the parking lot, paired with 6 CPS 36 inverters.
In numbers, the project delivers a 250 kW DC nameplate capacity, roughly 473,250 AC kWh of clean energy per year, and an estimated $212,963 in year-one utility-bill offsets.
System spec
What got built.
- Site
- 1241 Manor Blvd
San Leandro, CA - APN
- 80H-1586-7
- Utility
- Pacific Gas & Electric
- Seismic rating
- 1.53
- Irradiance
- 1,893
- System size
- 250.0 kW DC
- Estimated production
- 473,250 AC kWh / year
- Year-1 utility offset
- $212,963
- Solar panels
- 400 × Runergy 625 Bi-Facial
- Inverters
- 6 × CPS 36
- SolarPort structures
- 7
- Wire loss
- 2.0%
Quick request
Prefer email? We'll do the rest.
Fill in the basics and we'll reply within one business day with a model tailored to your site — production, ITC, MACRS, SGIP and demand-charge offset.
Or send us your details and we'll reach out.
A team member will respond within one business day. Your information is never sold.